Monday, 27 September 2010

Sunday 27th September - Filming Schedule

Filming Schedule

Below is a filming Schedule that Tom made before we started filming

Filming Session One

Date: Tuesday 12th October
Time: 13:00 to 15:00
Location: Suffolk Lodge- Garden, Driveway, Living Room
Actors: Sophie (Singer) Tom (Me) (Boyfriend)
Props: Only those that form the Mise-en-Scene of the garden and house
Costume: Normal Costume and Corset Costume
Equipment: Camera, Tri-Pod, Charger
Shots to be filmed: Location Shots, Arguement Sequence, Bench Sequence, Cage Sequence

Filming Session Two

Date: Tuesday 19th October
Time: 13:00 to 16:00
Location: Streets around Suffolk Lodge
Actors: Sophie (Singer)
Props: None Needed
Costume: Corset Costume
Equipment: Camera, Tri-Pod, Charger
Shots to be filmed: Wall Sequence, Handheld Sequence, Walking/ Running Sequence

Filming Session Three

Date: Tues 26th October *UPDATE* Re-scheduled (After Half Term) Tues 9th November
Time: 15:30 to 17:00
Location: Drama Room
Actors: Sophie (Singer)
Props: Mannequin and Microphone
Costume: Prom Dress, Short Lacy Dress, Flower Dress
Equipment: Camera,Tri-Pod, Charger, Block, Studio Lights, Media Filming Lights, Black Sheet
Shots to be filmed: Variety of Angles and Shot types with Mannequin and Costumes

*UPDATE* on 15th November


Filming Session Four

Date: Tuesday 16th November and Wednesday 17th November
Time: 13:00 to 16:00 and 10:00 to 12:15
Location: Suffolk Lodge- Bedroom and Garden and Streets around Suffolk Lodge
Actors: Sophie (Singer)
Props: Photo Album, Mobile Phone, Corset, Heels, Make-up and Bedroom Mise-en-Scene
Costume: Normal Costume and Corset Costume
Equipment: Camera,Tri-Pod, Charger
Shots to be filmed: Transformation Sequence, Re-Filming and Instrumental Sequence

No comments:

Post a Comment